LLZ 421
Installation
Operation and Maintenance
ILS 420
2−2
Ed. 01.04
SOAC
2.2
SHELTER FOUNDATIONS
See Fig. 2−2
The following sections contain information to cable trenches, foundations. The production of the indi-
vidual foundations and the excavation of cable trenches, are normally part of the civil works and not,
therefore, the subject matter of this description. Site specific requirements must be taken from the
project planning documents. The information on this subject herein, in consequence, only provided
for information purposes.
Cable trenches are to be respectively excavated between the nearfield dipole foundation and the
foundation for the antenna distribution unit and between the cable man hole and the shelter. See fig.
2−2 for a cross−section of a typical cable trench.
1
tube for data cable
2
tube for mains supply cable
3
diameter of each tube 100 mm
4
Arrangement of cable entry through shelter floor
5
1 tube (laid down in cable trench)
6
diameter of each tube 100 mm
7
tube for signal and monitor detector cable
*) for GP: for standard cabling 1 tube only
8
tube for mains supply cable
9
Recess (4x) only if stone bolts are used
*) dropped if shelter is fixed by anchor rods.
10 selected filling, 100 % compressed
15
48
94
15
50
279
249
50
25
22,5
15
15
A
A
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÇÇÇ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
min. 10
35
min. 100
10
11
12
13
View A−A
rotated 90°
2
8
7 *)
Door
1
3
6
Optional
11 bitumized (Nitroprime−10)
12 damp course (min. 150
µ
m)
13 hard core (layer height approx. 15 cm)
4
4
NOTE:
−dimensions in cm
−concrete quality B25
9 *)
9 *)
5
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
ÉÉ
É
É
É
É
É
É
30 cm
2
3
5
4
1
h = 80 cm
h = 50 cm
1
Strips with printed warning:
Caution earthing cable
2
Earth strip (aluminium or copper)
3
Sand filling
5
Tubes for HF cables
4
Tubes for mains cables
h = depends on local conditions
Example cable trench
Fig. 2−2
Standard foundation for Shelter (10 ft) and cable trench example
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...