
LLZ 421
Installation
Operation and Maintenance
ILS 420
2−8
Ed. 01.04
SOAC
2.3.3.3
Installing sulphuric acid Batteries for Emergency Power Supply
NOTE:
Take out block batteries from the transport case just before the first setup activities have
to be performed.
− Switch off battery circuit breaker F20 and F21 (down position, 2−10/2,1).
− Put the battery set G1 to G
n
in the battery compartment (2−6/10) and connect depending on type
of battery set as shown in Fig. 2−11.
− Connect all block connections (2−11/4).
− Connect cable terminal of the positive line (16 mm
2
, red, 2−11/1) to the positive pole of the battery.
− Connect cable terminal of the negative line (16 mm
2
, blue, 2−11/2) to the negative pole of the bat-
tery.
− Connect 3 monitoring and measurement lines (1,5 mm
2
) to battery "+" , "−", and half voltage point
(middle of battery set).
− Fasten all screws of the battery terminals (torque moment 15 Nm).
1
Battery circuit breaker fuse F21
2
Battery circuit breaker fuse F20
Shelter wall, right, inner view
1
2
Battery compartment
Fig. 2−10
Battery fuse box
1
Positive line (red)
4
Block connection
2
Negative line (blue)
5
Emergency battery 48 V(4x 12 V); capacity depends on type: 54, 72, 90 or 108 Ah
3
Cable terminal
6
Emergency battery 48 V(8x 6 V); capacity depends on type: 128 or 192 Ah
1
−
+
−
+
−
+
−
+
G1
G2
G3
G4
4
−
+
−
+
G1
G2
−
+
−
+
G3
G4
−
+
−
+
G7
G8
−
+
−
+
G5
G6
1
4
5
2
2
4
3
6
*)
*)
*) half voltage
Fig. 2−11
Emergency battery set
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...