
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−33
Ed. 01.10
SOAC
ÀÀ
ÀÀ
ÀÀ
ÀÀ
ÀÀ
ÀÀ
ÀÀ
ÀÀ
An auxiliary ground is required to measure the ground resistance of the antenna ground and the installation ground.
The disconnected ground connection can be used for one of the three measurements.
Counterpoise
Antenna
Shelter
Ring earth
Nearfield Dipole
Support element grounded
connected to ground
Ground connection
Disconnect for measurements
Auxiliary ground
Fig. 2−28
Example of ground of a Localizer installation
3
7
5
1
2
1
Ring ground around the shelter foundation
2
Ground rod (4x)
3
Ground connection for standard shelter
4
Ground connection (2x) for shelter with opt.
external overvoltage arrester box
5
Foundation to LLZ antenna
6
Ground laid down in the cable trench
7
Clamped joint
6
ca. 1 m
ca. 1 m
30 cm
ca. 6 m
shelter
door
4
40 cm
Fig. 2−29
Ring earth and earth connection of shelter (example LLZ)
Содержание 421
Страница 2: ......
Страница 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Страница 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Страница 56: ......
Страница 58: ......
Страница 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Страница 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Страница 98: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 8 Ed 01 10 SOAC ...
Страница 108: ...LLZ 421 Alignment Procedure LLZ 1F Dip Refl Operation and Maintenance ILS 420 4 18 Ed 01 10 SOAC ...
Страница 122: ...LLZ 421 Alignment Procedure LLZ 2F Dip Refl Operation and Maintenance ILS 420 5 8 Ed 07 08 SOAC ...
Страница 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Страница 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Страница 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Страница 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Страница 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...