TSP Edge User’s Manual
40-400-00065, Rev. E
45
Interval
Interval is used to stagger the testing on the channels. Using the Interval delays the
calls to each channel (in seconds) starting with the first channel listed in the Assigned
Channels section. In the Interval box, type or select the number of seconds.
By leaving the interval set to 0 seconds (the default), all channels assigned to the
Control Set initiate calls simultaneously once the test begins.
Stop
For ending a simulation, the choices of Time, Elapsed Time, Number of Calls, and
Manual are available. Selecting Time enables a field to set a predefined time for the
Edge to stop testing. Selecting Elapsed Time enables a field to set the amount of time
(in hours and minutes) the test is to run once started. The Number of Calls option is
used to set a specific number of calls to be placed to each of the channels assigned.
Selecting Manual stops the test when the Control Set Enable button is disabled.
End-to-End Example
The control set for end-to-end operation is configured with two template fields. For
this example, we will use Switch Emulation with POTS and T1 Channels.
1. Go to
Control Sets
menu and choose
New
. Name the control set “
End-to-
End Example
” and click
OK
.
2. In the Control Set dialog box, select
Switch Emulation
for the
Control
Set Type
.
3. Create a new template by clicking the
New
button next to the first
Template
field. Name the Template “
Analog LS
”. Choose
Analog Loop
Start
for the Channel Protocol and click
OK
.
4. Click
New
at the second Template field. Name the Template “
T1 Wink
St
”. Choose
T1/E1 Wink Start
for the Channel Protocol and click
OK
.
The names “Analog LS” and “T1 Wink St” appear in the Template fields in the
Control Set dialog box. See Figure 28.
Содержание TSP Edge
Страница 1: ...TSP Edge User s Manual 40 400 00065 Rev E ...