
98
Teledyne API – Model T400 O
3
Analyzer
083730400A DCN8130
Table 5-1. T400 Maintenance Schedule
ITEM
ACTION
FREQ
CAL
CHECK
REQ’D.
1
MANUAL
SECTION
DATE PERFORMED
Particulate
Filter
Replace
Weekly or as
needed
Yes
Verify
Dashboard
Functions
Record and
analyze
Weekly or after
any Maintenance
or Repair
No
Pump
Diaphragm
Replace
As Needed
Yes
- -
O
3
Reference
Scrubber
Replace
Every 2-5 years,
as needed
Yes
IZS
Zero Air
Scrubber
Replace
Annually
No
Desiccant
(Option 56)
Replace
Regularly as
needed
No
Absorption
Tube
Inspect
- - -
Clean
Annually
- - -
As Needed
Yes
Flow Check Perform Flow
Check
Every 6 Months
No
Leak Check
Perform
Leak Check
Annually or after
any Maintenance
or Repair
Yes
Pneumatic
lines
Examine and
clean
As needed
Yes if
cleaned
- -
Содержание T400
Страница 2: ......
Страница 101: ...99 Teledyne API Model T400 O3 Analyzer 083730400A DCN8130 This page intentionally left blank ...
Страница 176: ...This page intentionally left blank A 4 083730400A DCN8130 ...
Страница 177: ...Appendix B Wiring Diagram 083730400A DCN8130 ...