AFA4000/E
VAV Airflow Controller / p.79
Figure 42: Light curtain vertical range
2.
When the light curtain transmitter and receiver have been positioned, mark the sidewall
using the fixing holes in the transmitter and receiver as templates.
3.
Drill the holes for the fixing screws. Use the 2 mm (0.08") drill bit provided and fix the
transmitter and receiver.
Figure 43: Transmitter / Receiver fixing holes
4.
On a fume hood with an inner and outer sidewall the light curtain transmitter and receiver
cables run through the sidewall into the service void and up to the Sash Light Curtain Control
Box on top of the fume hood.
Содержание AFA4000/E
Страница 1: ...AFA4000 E VAV Airflow Controller Installation and operating manual Issue 2...
Страница 57: ...AFA4000 E VAV Airflow Controller p 57 Figure 22 AFA4000 E inverter control connections...
Страница 58: ...AFA4000 E VAV Airflow Controller p 58 Figure 23 AFA4000 E damper control connections...
Страница 59: ...AFA4000 E VAV Airflow Controller p 59 Figure 24 AFA4000 E typical connection diagram...
Страница 60: ...AFA4000 E VAV Airflow Controller p 60 Figure 25 AFA4000 E AS typical connection diagram...
Страница 62: ...AFA4000 E VAV Airflow Controller p 62 Figure 27 SM7 airflow sensor dimensions...
Страница 71: ...AFA4000 E VAV Airflow Controller p 71 Figure 34 Side views of a rack and pinion drive typical installation...
Страница 96: ...AFA4000 E VAV Airflow Controller p 96 6 9 Auto Sash System Control Box general wiring diagram...
Страница 158: ...AFA4000 E VAV Airflow Controller p 158...
Страница 182: ...AFA4000 E VAV Airflow Controller p 182 Figure 79 Connection diagram with RS232 485 converter...