4
Installation
4.1 Safety measures during installation
Observe the following safety notes when performing the work
described in Section Installation .
DANGER!
Risk of death by electrocution!
–
Only technical professionals may perform the
work described in Section Installation .
–
Do not connect cables to the inverter until
explicitly asked to do so in the manual.
–
Do not open the housing of the inverter.
–
Connect only SELV circuits to the RJ45 sockets.
–
Lay the cables such that the connection cannot
come loose accidentally.
–
When laying cables, ensure that no damage
occurs to any of the constructional fire safety
measures in the building.
–
Make sure that no inflammable gases are
present.
–
Observe all applicable installation regulations
and standards, national laws and connection
values specified by the regional power supply
company.
DANGER!
Danger from electrical current
ELECTRICAL SHOCK AND DISCHARGE!
The PV generators/lines may be energised as soon as
the PV generators are exposed to light.
Always disconnect all DC and AC cables as follows before starting
work on the inverter:
1.
Turn the AC circuit breaker to off. Take measures to prevent
the system from being unintentionally switched on again.
2.
Set the DC circuit breaker on the inverter to position
0
. Take
measures to prevent the system from being unintentionally
switched on again.
3.
Disconnect the DC cable plug connectors according to the
manufacturer's instructions.
4.
Disconnecting the AC plug from the inverter
⇒
Release safety
clip at the front of the AC plug by depressing it with a
suitable object, then pull the plug out.
EN
747,431 | Z09.2 | 18/02/2016
31
Содержание coolcept StecaGrid 1500
Страница 1: ...Installation and operating instructions EN coolcept coolcept x 747 431 Z09 2 2016 02 18...
Страница 57: ...Fig 20 Email confirming successful registration EN 747 431 Z09 2 18 02 2016 57...
Страница 85: ...Appendix EN 747 431 Z09 2 18 02 2016 85...
Страница 93: ...747 431 Z09 2 2016 02 18...
Страница 94: ......