1.
Press
SET
to call up the item.
2.
Press
rs
to select a meter type.
3.
Press
SET
.
4.
Press
ESC
to quit the sub-menu.
4.9 Switch on DC
Place DC load-break switch on the inverter on position
I
(Fig.
left). After testing via the internal MSD (approx. 2 minutes),
the power fed into the grid can be shown on the display
(assuming that sunlight is present).
NOTICE!
On the coolcept-x-devices the DC load-break switch
can be safeguarded against being switched on
unintentionally with a padlock (shackle thickness max.
7 mm).
4.10
Deinstalling the inverter
DANGER!
Risk of death by electrocution! Only technical
professionals may perform the work described in this
section. Follow the safety instructions at the
beginning of the Section "Installation".
1.
Set the DC circuit breaker on the inverter to position
0
(Fig.
left).
2.
Turn the AC circuit breaker to off.
3.
Wait for at least 10 minutes before disconnecting the plug-in
connectors of the DC cable.
Switching off the AC and
DC supplies
EN
747,431 | Z09.2 | 18/02/2016
47
Содержание coolcept StecaGrid 1500
Страница 1: ...Installation and operating instructions EN coolcept coolcept x 747 431 Z09 2 2016 02 18...
Страница 57: ...Fig 20 Email confirming successful registration EN 747 431 Z09 2 18 02 2016 57...
Страница 85: ...Appendix EN 747 431 Z09 2 18 02 2016 85...
Страница 93: ...747 431 Z09 2 2016 02 18...
Страница 94: ......