27
TRAK Machine Tools
Southwestern Industries, Inc.
TRAK TMC Mills with ProtoTRAK RMX CNC Safety, Installation, Maintenance, Service & Parts List
Loose Large Items shipped Inside or with TMC
(4) Skirts
(1) X & (2) Y Axis Covers
(1) Large Coolant Tank with coolant and coolant wash pumps installed
(1) Auger motor and chute standard on TMC 7 & 10, optional on TMC 5
Brackets fastened to machine and need removal
(1) Column support bracket
(1) Bed shipping bracket
(1) X-axis shipping bracket
2.8
Electrical Connection
The TMC5, TMC7, and TMC10 are configured for 208-volt 3 phase electricity (200 to 240 volts is
acceptable).
If 480-volt, 3 phase power is present, you must use a step-down transformer to 208-volt, 3 phase.
Incoming 208 V power connects to the machine through the electrical box located on the back of the
column. The power cable enters the electrics box through a hole on the top of the box.
DANGER!
Be certain that 208-volt electricity (typical range 200
–
240V) is used.
DANGER!
The 208-volt line must originate from a dedicated and independent fused box with a manual shut-off
lever. It is the responsibility of the purchaser to supply a wired box that meets all local codes and
regulations.
TRAK Machine Tools recommends the machine be earth grounded by driving a copper rod into the
ground. It is the responsibility of the customer to install this rod.
DANGER!
Only a qualified electrician should wire the 208-volt 3 phase electricity.