Installation Checklist
Installer
–
Use this checklist to assure a complete setup on the TMC.
Installation Checklist
1. Shut off power to the machine.
2. Visually inspect the 208-volt wiring (or 480-volt if transformer option is installed) going into the
electrical panel. Visually verify the wiring is correct per our wiring diagram and the voltage is
between 200 and 240 volts. Make sure a strain relief is being used where the wiring enters the
cabinet. Have the customer repair any wiring discrepancies.
See figure 2.8.1a and 2.8.2a. Double
check how the machine has been grounded and notify user if it is not done per our
recommendations. See sections 2.8 & 2.8.1 for recommended grounding.
3. If 480-volt transformer option is installed, measure incoming voltage and adjust transformer
taps as necessary. See section 2.8.2a.
4. Clean the machine if needed and remove any remaining protective grease.
5. Unlock table, saddle, head and tool changer by removing support brackets
WARNING! Refer
to section 2.5 before proceeding.
Install 2 door handles on front door.
6. Install auger motor as it ships in a separate box. Auger screw fastens to motor shaft with 2 set
screws and 2 brass pieces as shown. Hardware bagged and attached to auger motor
.