6-68
DMS-B150L/B210S/B80L/B110S/EX150L/EX210S
5.
Install the cable clamp 2 with the two screws at the
two locations.
6.
Install it on the side of the DMS-B80L/B110S main
unit tentatively with the three screws.
6-11-4. Installation of the DMSA-AT80
1.
Remove the screw
1
to the screw
3
of the seven
screws (PWH4
x
8) fixing the top plate of the DMS-
B80L/B110S, and fix the seven hexagonal head cap
bolts M4
x
12 (with frange) tentatively that are
supplied with the DMSA-AT80.
2.
Install the PC bracket R (80) by aligning it with the
two pieces of the screw
1
that are tentatively fixed in
step 1. Then slide it in the direction of arrow A and
tighten the screws finally.
3.
Install the PC bracket M (80) by aligning it with the
three pieces of the screw
2
that are tentatively fixed in
step 1. Then slide it in the direction of arrow B and
tighten the screws finally.
4.
Install the FC bracket by aligning it with the two
pieces of the screw
3
that are tentatively fixed in step
1. Then slide it in the direction of arrow C and tighten
the screws finally.
1
1
2
2
2
3
3
PWH4
x
8
Hexagonal head
cap bolt M4
x
12
(with flange)
A
B
C
1
1
3
3
2
2
2
PC bracket R (80)
PC bracket M (80)
FC bracket (80)
B4
x
5
B4
x
5
B4
x
5
B4
x
5
Cable clamp 2
Cable clamp 2
PWH4
x
8
PWH4
x
8
PWH4
x
8
DMS-B80L/110S
6-11. Installing the Package Supporting Equipment