
2
DMS-B150L/B210S/B80L/B110S/EX150L/EX210S
5. About Installation Work
5-1.
Notes during Installation ............................................................................. 5-1
5-2.
Tools ............................................................................................................ 5-2
6. Installation Procedure
6-1.
Installation Flow .......................................................................................... 6-1
6-2.
Removal and Installation of the Cabinets ................................................... 6-2
6-3.
Removal of the Shipping Metal Fixtures .................................................... 6-6
6-4.
Installation of the Basic Console ............................................................... 6-10
6-5.
Connecting Extension Consoles ................................................................ 6-12
6-6.
Installation of DMSA-CBL1 ..................................................................... 6-28
6-7.
Prevention of Falling ................................................................................. 6-37
6-8.
Voltage Selector Setting and Notes ........................................................... 6-42
6-9.
Installation of the Tape Drive ................................................................... 6-43
6-9-1.
Basic Console ........................................................................... 6-43
6-9-2.
Extension Console .................................................................... 6-47
6-9-3.
Routing the Cables to Be Connected to the Drives .................. 6-54
6-10. Setting the Switches .................................................................................. 6-55
6-11. Installing the Package Supporting Equipment .......................................... 6-57
6-11-1. Installation of the DMSA-TS08/TS16 ..................................... 6-57
6-11-2. Installation of the DMSA-EH16/EHAC/EHACK ................... 6-60
6-11-3. Installation of the DMSA-CBJ80/CBJ15/CBJEX ................... 6-62
6-11-4. Installation of the DMSA-AT80 .............................................. 6-68
6-11-5. Installation of the DMS-PCU1 ................................................. 6-70
6-11-6. Installation of the DMS-FSW24/28 ......................................... 6-72
6-11-7. Installation of the DMSA-SBE1 .............................................. 6-73
6-12. Wiring Inside Console ............................................................................... 6-74
7. Connecting the Cables
7-1.
Connecting the Power Cable and the UPS .................................................. 7-1
7-1-1.
Connecting the Power Cable ...................................................... 7-1
7-1-2.
Connecting the UPS Cables and Setting the Switches ............... 7-1
7-2.
Signal Input/Output ..................................................................................... 7-2
7-3.
Connecting Connectors and Cable .............................................................. 7-4
8. Operation Check