Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 119 -
SMA Regelsysteme GmbH
“PARGEN“ (3+6)
Name
Description
615_tGen stop
1 ... 180 s:
Length of time the relay is controlled to stop the generator
616_tGen lock
1 ... 180 min:
Period of time the generator – after having been stopped -
cannot be restarted via the Sunny Island (can be shortened
by acknowledgement in the “GENSET“ (2-2) menu)
617_tGen fail
1 ... 180 min:
Period of time the generator cannot be restarted via the
Sunny Island after a generator failure (can be shortened by
acknowledgement in the “GENSET“ (2-2) menu)
618_tGen faillock
1 ... 168 h:
Period of time the generator cannot be restarted via the
Sunny Island after a certain number of failures as defined in
“605_GenStRetr“ has occurred during start-up (can be
shortened by acknowledgement in the “GENSET“ (2-2)
menu)
625_PldL GenOn
-100 … 100 %
Switch-on threshold in % of the nominal power at one phase
for the power-related generator start or the power-related re-
lays (only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
626_PldL GenOff
-100 … 100 %
Switch-off threshold in % of the nominal power at one phase
for the power-related generator start or the power-related re-
lays (only K5 or K6)
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
627_PldS GenOn
- 100 … 100 % Switch-on threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
628_PldS GenOff
- 100 … 100 % Switch-off threshold in % of the nominal power based on the
cumulative power within the three-phase sys tem for the
power-related generator start or the power-related relays
(only K5 or K6).
If the relays shall be switched in relation to the power, the parameters
“705_Man K5” and/or “706_Man K6” must be set to “LOAD“
629_TavgLdLx
5 … 60 s
Averaging time for the power calculation per phase (see
also “625_PldL GenOn” and “626_PldL GenOff”)
630_TavgLdSum
1 … 20 min
Averaging time for the calculation of the cumulative power
within the three-phase system (see also “627_PldS GenOn”
and “628_PldS GenOff”)
631_PldLzMin
0 … 100 %
Lower limit for the charging state, when the Ecopower CHP
will always be started
632_PldLzMax
0 … 100 %
Upper limit for the charging state, when the Ecopower CHP
will never be started
633_PConsMin
0 … 2000 W
Power limit for the load power (cumulative power averaged
over all three phases within the time period of the parameter