Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 139 -
SMA Regelsysteme GmbH
“DATGRD“ (1+4)
Name Description
Uconv eff
Current grid voltage
Fconv
Current grid frequency
Iconv eff
Grid current (RMS value)
Iconv Sum
Inverter current (three phases)
Pconv
Active grid power Sunny Island
Pconv Sum
Total of active grid power Sunny Island (three phases)
Qconv
Reactive grid power Sunny Island
Qconv Sum
Total of reactive grid power SI (three phases)
Sconv
Apparent grid power Sunny Island
Sconv Sum
Total of apparent grid power Sunny Island (three phases)
Uext eff
RMS value of voltage on Generator / Mains sync. input
Fext
Current grid frequency at synchronous input port
Iext eff
Current generator current (of converter)
Iext Sum
Total of generator current (three phases)
Pext
Current active generator power
If an “ecopower Mini-BHKW” is installed this equals the power of the
CHP unit, as received from by the Sunny Island on its COM3 port.
Pext Sum
Total of active generator power (three phases)
If an “ecopower Mini-BHKW” is installed this equals the sum of the Sunny
Island’s Power and the power of the CHP unit, as received from by the
Sunny Island on its COM3 port.
Table 9.5:
Menu “DATGRD“ (1+4)