Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 85 -
SMA Regelsysteme GmbH
Parameter changes should always be made in standby mode. Other-
wise the corresponding operating values are changed as well imme-
diately after pressing [ ENTER ]. Faulty entries cannot be corrected
fast enough and may lead to damages in the plant!
The settings defined will be maintained even if the Sunny Island is
switched off. Therefore you do not have to enter all plant settings again
e. g. after a battery change.
The individual configuration procedures are described in detail in the following chap-
ters.
6.1 First Configuration
The first configuration of the Sunny Island in a new plant or a plant that has been
drastically modified should be made by selecting the menu item “New Sys MASTER“
resp. “New Sys SLAVE” during the initialization phase. To do so you require the
password for „Level: 1“ (installer).
6.1.1 “Master” or Single Sunny Island (“New Sys MASTER”)
In order to configure a Sunny Island that is the only one or intended for being a “Mas-
ter” in a system (e.g. in a three-phase system or in single-phase multiple-Sunny Is-
land system (see Chapter 11.6)) select “New Sys MASTER” in the corresponding
menu (as described in Chapter 5) with the arrow keys and confirm with
[
ENTER
].
Now enter the password for „Level: 1“ (installer).