Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 200 -
SMA Regelsysteme GmbH
„PARALL“ (3+9)
Parameter Unit
Min.
Max.
Default
Description
11: DroopMains The Sunny Island is operated to-
gether with an utility in droop
mode.
12: DrpGenMains
The Sunny Island is oper-
ated together with a generator
capable of droop characteristic-
sand an untility in droop mode.
13: BHKW-Isl-Therm
Sunny Island is operated
together with the ecopower CHP.
In difference to “BHKW-Island”
the Sunny Island will not switch
off the CHP when no more elec-
trical power is needed. So the
ecopower CHP will be able to
provide as much thermal energy
as needed
603_GenSet Interf
(A)
0
4
0
0: None:
generator not controlled by
Sunny Island
1: Type 1:
autostart, relays K1+K2
2: Type 2:
3 contacts run / start, relays K1,
K2, K6
3: Type 3:
3 contacts start / stop, relays K1,
K2, K6
4: EcoPower
Ecopower CHP
(see also Fig. 12.1: Starting phase sequence for
different generator types)
604_GenSet Ctrl
(C)
0
3
0
The Sunny Island reduces its current input in
charge operation (RUN_I) ……
0: OFF:
... not at all
1: F_MAINS:
... as a function of generator fre-
quency (see “407_Fext nom”)
2: I_GEN:
... as a function of generator cur-
rent (converter required, see
Chapter 3.4.5)
3: BOTH:
... as a function of generator fre-
quency (see “407_Fext nom”)
and current (converter required,
see Chapter 3.4.5)
605_GenStRetr
(C)
1
30
3
Max. number of attempts to start the generator,
before the state “Fail Locked“ is reached (see also
parameter 618). After the minimum run-time of the
generator has expired, the counter will be reset.
606_CurTrfRatio
(A)
Ain/5
Aout
1
1000
5
Current transformer ratio (in A per 5 A) for meas-
urement of generator current