
SIJECT OP15B Screens
SIJECT 15/16 Operation Manual June, 2003
3-52
3.2.8 Air blow screen
Fig
3-40 Air
blow
screen
Operating sequences
Press the air blow key to enter the air blow screen. See Fig 3-40.
The screen displays two statuses: Air blow 1 and Air blow 2. When the
mold reaches the position, air can blow by the set time.
Air blow 1 (Air 1)
-
select or deselect the air blow 1. When the mold
reaches the position, air blow will be controlled by the set time.
Air blow 2 (Air 2)
-
select or deselect the air blow 2. When the mold
reaches the position, air blow will be controlled by the set time.
Mold position (MldPos)
-
display the actual position of mold.
Press Manual Air blow 1
to activate air blow 1, and press air blow 2
to enable air blow 2 function.