CP 1243-8 IRC
Operating Instructions, 06/2015, C79000-G8976-C385-01
45
Configuration and operation
4
4.1
Note on operation
NOTICE
Closing the front panels
To ensure interference-free operation, keep the front panels of the module closed during
operation.
4.2
Configuration in STEP 7
Configuration in STEP 7 - Overview
You configure the CP in the following configuration tools one after the other:
●
STEP 7 V5
–
Configuration of a proxy for the CP (PROXY CP1243-8 IRC) in an S7-300 station
–
Configuration of the connected WAN networks and connections in the SINAUT
engineering software
You will find the description of the procedure in the section Configuration in STEP 7 V5
(Page 48).
●
STEP 7 Basic
–
Configuration of further parameters of the CP, its data points and messages to be sent
–
Downloading the project data from the engineering station to the S7 station
You will find the description of the procedure in the section Configuration in STEP 7 Basic
(Page 57).
You will find the required STEP 7 products and versions in the section Requirements for
Note
Configuration of connections
Remember to create the connections to be used by the CP in the STEP 7 V5 project.
Содержание CP 1243-8 IRC
Страница 10: ...Table of contents CP 1243 8 IRC 10 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 104: ...Diagnostics and upkeep 6 3 Module replacement CP 1243 8 IRC 104 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 112: ...Approvals CP 1243 8 IRC 112 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 114: ...Dimension drawings CP 1243 8 IRC 114 Operating Instructions 06 2015 C79000 G8976 C385 01 Figure B 2 From above ...
Страница 134: ...Accessories C 4 Connecting cables CP 1243 8 IRC 134 Operating Instructions 06 2015 C79000 G8976 C385 01 ...