Configuration and operation
4.7 Configuration in STEP 7 Basic
CP 1243-8 IRC
Operating Instructions, 06/2015, C79000-G8976-C385-01
57
4.7
Configuration in STEP 7 Basic
4.7.1
Overview of the configuration
Requirement
The complete configuration of the CP in STEP 7 Basic is only possible after configuring in
STEP 7 V5 (see above).
Overview of configuration in STEP 7 Basic
Follow the steps below when configuring:
1.
Create a STEP 7 project.
2.
Insert the S7-1200 CPU for the SIMATIC station.
3.
Create the PLC tags required for the data points in the CPUs, see also point 7.
4.
Insert the CP 1243-8 in the stations.
5.
If you use Ethernet-based communication, create an Ethernet network and connect the
CP to the Ethernet network.
The configuration of WAN networks is not possible in STEP 7 Basic and is not necessary.
The configuration of telecontrol connections between the CP and master station is not
possible in STEP 7 Basic and is not necessary.
6.
For the CP, import the configuration data using the text file from the STEP 7 V5 project.
For information on the import, refer to the section Importing configuration data (Page 58).
7.
Configure the CP:
–
Configure the further parameters of the CP.
For information on this, refer to the following sections.
–
Configure the data points of the CP.
You will find information on the data points in the section Configuring data points and
–
The configuration of the security functions is necessary when using telecontrol
communication.
You will find information on the security functions in the section Security functions
(Page 89) and in /11/ (Page 137).
8.
Download the project data to the station.
When you load the station, the project data of the station including the configuration data
of the CP is stored on the CPU.
You will find further information on configuration and downloading in the STEP 7 information
system.
Содержание CP 1243-8 IRC
Страница 10: ...Table of contents CP 1243 8 IRC 10 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 104: ...Diagnostics and upkeep 6 3 Module replacement CP 1243 8 IRC 104 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 112: ...Approvals CP 1243 8 IRC 112 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 114: ...Dimension drawings CP 1243 8 IRC 114 Operating Instructions 06 2015 C79000 G8976 C385 01 Figure B 2 From above ...
Страница 134: ...Accessories C 4 Connecting cables CP 1243 8 IRC 134 Operating Instructions 06 2015 C79000 G8976 C385 01 ...