Installation, connecting up, commissioning
3.2 Installing, connecting up and commissioning
CP 1243-8 IRC
44
Operating Instructions, 06/2015, C79000-G8976-C385-01
Commissioning the module
The remaining steps in commissioning involve downloading the STEP 7 project data. One
requirement for the full commissioning of the module is the completeness of the STEP 7
project data, see Configuration and operation (Page 45).
The STEP 7 project data of the CP is transferred when you load to the station. To load the
station, connect the engineering station on which the project data is located to the Ethernet
interface of the CPU.
You will find more detailed information on loading in the following sections of the STEP 7
information system:
●
“Loading project data"
●
“Using online and diagnostics functions"
Dismantling
WARNING
Keep to the order when dismantling
Remove the plugs of the data cable from the TS module and from the CP before you
remove the power plug from the CP and therefore disconnect the ground connection of the
devices.
1.
Pull down the two lower DIN rail clamps on the rear of the devices with a slotted
screwdriver.
This releases the locking mechanism.
2.
Swing the devices out of the DIN rail profile to the front.
Содержание CP 1243-8 IRC
Страница 10: ...Table of contents CP 1243 8 IRC 10 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 104: ...Diagnostics and upkeep 6 3 Module replacement CP 1243 8 IRC 104 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 112: ...Approvals CP 1243 8 IRC 112 Operating Instructions 06 2015 C79000 G8976 C385 01 ...
Страница 114: ...Dimension drawings CP 1243 8 IRC 114 Operating Instructions 06 2015 C79000 G8976 C385 01 Figure B 2 From above ...
Страница 134: ...Accessories C 4 Connecting cables CP 1243 8 IRC 134 Operating Instructions 06 2015 C79000 G8976 C385 01 ...