Installation and commissioning
3. Configure the parameters in
Metering Setup > Advanced
if appropriate.
Advanced tab
Parameter
Values
Description
PhaseOrder
ABC, ACB
Power system’s rotation order of voltage
phases
V4 PT Prim
1 to 999,999
V4 potential transformer's primary
winding voltage rating
V4 PT Sec
1 to 999,999
V4 potential transformer's secondary
winding voltage rating
I4 Prim
1 to 999,999
I4 current transformer's primary winding
current rating
I4 Sec
1 to 999,999
I4 current transformer's secondary
winding current rating
I5 Prim
1 to 999,999
I5 current transformer's primary winding
current rating
I5 Sec
1 to 999,999
I5 current transformer's secondary
winding current rating
Scale Rev Param
ON, OFF
Specifies whether revenue readings are
presented as primary or secondary side
values (ON = primary side, OFF =
secondary side)
Using the phasor viewer
Phasor diagrams can help verify or troubleshoot issues with voltage and current
input wiring.
Use ION Setup’s Phasor Viewer to display a real-time phasor diagram of the
voltage and current input signals.
1. Start ION Setup then open the Setup assistant for your meter.
2. Select
Metering Setup > Phasor
.
3. Select
Phasor Viewer
and click
Show
.
4. To change the polarity of the voltage or current inputs, click
Show Setup
to
display the Polarity Settings.
Select the box beside the inputs you want to invert polarity, then click
Apply
to Meter
.
Basic setup using the webpages or display
You can use the meter webpages or display to configure basic metering
parameters.
•
Using the webpages: Navigate to
Setup > Metering
.
•
Using the display: Navigate to
Setup Menu > Meter Setup
.