9. Click
Start
.
A dialog box describes the firmware upgrade progress, verifies the firmware,
and finishes with an overview stating whether the firmware was successfully
uploaded.
Test mode
Test mode is typically used for verifying meter functions.
The meter is usually reading data from a test power supply while function
verification is performed.
The values shown in the test mode display screens represent different
accumulators than those shown in norm or alt mode (although they perform some
of the same basic measurements). The test mode display values are for accuracy
checking purposes; they only accumulate while the meter is in test mode.
You can create custom test mode screens and modify the existing test mode
screens.
NOTE:
You cannot place revenue-locked meters into test mode.
Several things to note about test mode:
•
All of the billing quantities that are recorded when the meter is in Normal
mode stop accumulating when the meter is switched to test mode – the data
is sent to special test mode registers instead.
•
The values accumulated in these test registers are displayed on the test
mode displays and in ION Setup.
•
The regular normal mode billing registers are unaffected while the meter is in
test mode; accumulation of this data continues as soon as you exit test mode.
•
All test registers are reset to zero when you exit test mode.
Test mode default screens
Your meter has default test mode display screens.
NOTE:
You can modify the test mode display screens or add custom screens
using ION Setup.
Screen
Description
Demand test
This screen shows test mode kW delivered and received values. Both
quantities are produced from a sliding window (rolling block) demand
calculation.
Reactive energy
test
This screen shows test mode kVARh delivered and received values.
Active energy
test
This screen shows test mode kWh delivered and received values.
Putting your meter in test mode using the display
You can put your meter into test mode using the display.
NOTE:
You cannot place a revenue-locked meter into test mode.
1. Press the Home button.
2. Press
Up
or
Down
to navigate to
Normal Display Mode
.
3. Press
Select
.
4. Press
Down
to navigate to
Test Mode
.
7EN05-0390-00
199
Содержание 9810 Series
Страница 1: ...9810 series User manual 7EN05 0390 00 09 2018 www usa siemens com pds ...
Страница 4: ......