
- 98 -
[Program control start type]
Program control start type can be selected in [Program control start type].
PV start:
Only when program control starts, step SV and step time are advanced to the PV,
then program control starts.
However, if step SV at the time of program control start is higher than the PV (when PV start
is initiated), then program control will start from the SV set in [Step SV when program control
starts].
(Fig. 8.1.1-2)
PVR start:
When program control starts and in pattern repeating, the step SV and step time are
advanced to the PV, then the program control starts.
Action is the same as that of PV start. Refer to (Fig. 8.1.1-2).
SV start:
Program control starts from the SV set in [Step SV when program control starts].
(Fig. 8.1.1-3)
100
1:00
Time
PV start point
When program control starts,
step SV is advanced to PV (25 ).
25
0:45
100
1:00
Time
Program control starts.
Program control starts from the SV set in
[Step SV when program control starts].
Содержание PCA1
Страница 1: ...PROGRAMMABLE CONTROLLER PCA1 INSTRUCTION MANUAL ...
Страница 9: ... 9 2 Name and Functions of Controller Fig 2 1 ...
Страница 179: ... 179 ...