- 30 -
6. Basic Operating Procedure after Power ON
and Setting Examples
6.1 Basic Operating Procedure after Power ON
Power ON
Input parameter
(p.34)
Output parameter
(p.35)
Event output
parameter
(p.35)
PID block
(p.39)
Wait block
(p.39)
Alarm block
(pp.39, 40)
Output block
(p.41)
Pattern setting
(pp.37 - 39)
Other parameters
(p.36)
AT Perform
(pp.41, 42)
Test operation
RUN
Set Input and Output parameters.
Set each block data.
Set program patterns.
Set program control related data.
Turn the load circuit power ON, and
perform test operation.
Select AT mode, and perform AT.
Initial setting
Program pattern
setting
Block setting
Содержание PCA1
Страница 1: ...PROGRAMMABLE CONTROLLER PCA1 INSTRUCTION MANUAL ...
Страница 9: ... 9 2 Name and Functions of Controller Fig 2 1 ...
Страница 179: ... 179 ...