![SCHUNK SRM 10 Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/schunk/srm-10/srm-10_assembly-and-operating-manual_1216055055.webp)
Mounting and adjustments, size 10 - 14
5. Apply pressurized air to air connection "A".
✓
The product swivels from the center position to end
position 1.
6. Open exhaust air throttle valve "C" incrementally until the
desired swiveling time in the end position is reached.
7. Observe movement of the load in front of and in the end
position.
✓
The movement brakes smoothly,
no
springing back or
swiveling of the load is visible. The product is correctly
adjusted.
✓
OR: Springing back or swiveling of the load visible
in
the end
position. Increase absorber stroke,
.
✓
OR: Springing back or swiveling of the load visible
in front of
the end position, then slow rotary movement to the end
position. Turn off exhaust air throttle valve "C"
incrementally, if necessary reduce the absorber
stroke,
8. Swivel repeatedly to test the setting, readjust if necessary.
Adjustment for end position 2
■
Load that corresponds to the operating conditions is mounted
on the pinion (1).
1. Turn the pinion counter-clockwise to the stop.
2. Apply pressurized air to air connection "C".
✓
The product swivels to the center position.
3. Open the exhaust air throttle valve "B" incrementally until the
desired swiveling time in the center position is reached and the
over-swiveling and settling of the load in the center position is
low.
IMPORTANT! Too high a swiveling speed leads to more
frequent over-swiveling and settling of the load and thus to
increased wear of the product.
4. Apply pressurized air to air connection "B".
✓
The product swivels from the center position to end
position 2.
55
12.00 | SRM | Assembly and Operating Manual | en | 1346850