Tel: 886.2.2175 2930 Email: [email protected]
www.salukitec.com
24
Fig. 3.2 Switch on Rear Panel (Middle)
Fig. 3.3 Power Switch on Front Panel (Right)
b) Turn on/off
Start-up
Step 1: turn on the power switch (“|") on the rear panel.
Step 2: turn on the power switch in the lower left corner of the front panel. Check whether it is pressed (
). In this case, the power
indicator above the power switch will turn green from yellow.
Step 3: about one minute is required for the network analyzer to start the Windows 7 system. After a series of self-inspection and
adjustment procedures, the main measurement program will be run.
Preheating for cold start of the instrument
In order to meet the performance indicators of S3602 series vector network analyzer in cold start, preheat it more than 30 minutes before
measurement.
Run the analyzer application program.
The application program will be automatically run after the network analyzer is started. After exiting the application program, you can run
the measurement program again according to the following method.
Method 1
: click [Start] of the task bar in the lower left corner of the screen. Point to [Program] in the Start menu and then [Vector network
analyzer] in the program sub-menu. Click [Vector network analyzer] in the pop-up sub-menu. Then the measurement application program
will be run in the analyzer. You can also double-click the shortcut key on the desktop to run the program.
Method 2
: press [Reset] in the functional key zone. Then the application program of the S3602 series vector network analyzer will be
run.
Shutdown
Step 1:
turn off the power switch in the lower left corner of the front panel (as shown in Fig. 3.3). In this case, the shutdown process is
started (the power supply will be shut down after processing of software and hardware). After dozens of seconds, the instrument will be
powered off. The power indicator above the power switch will turn yellow from green.
Step 2:
turn off the power switch ("O") on the rear panel, or disconnect the power supply of the instrument.
Thus the instrument is off.
Shut Down
The instrument in normal operation must be shut down by operating the power switch of the front panel. Do not directly operate the
power switch of the rear panel or directly cut off the power supply of the instrument; otherwise, the instrument cannot be shut down
normally and may be damaged, or the current status/measurement data may be lost. Shut down the instrument properly. In case of
failure of normal shutdown caused by the anomaly of the operating system or application program, hold [Power/Standby] key for four
seconds at least to shut down the analyzer.