84
Altering the Operational Data
Press Arrow Right to move to period 2.
Press ENTER and enter the duration of period 2.
Press ENTER to confirm the input.
Enter the start and end value of the concentrate quantity in kg.
Press ENTER to confirm the input. There is no need to enter
the start value of a period as this value corresponds to the end
value of the preceding period.
Press Arrow Right to go to the periods 3 to 5. Proceed as with
period 1 and 2.
After the 5th screen the display shows duration of the concen-
trate 1--plan and of the feeding plan.
Example with standard values:
The next screen shows plan requirement for the quantity of
concentrate 1. Example with standard values:
Standard values of concentrate plan 1
for all groups :
period 1: 7 days 0.2 kg
period 2: 42 days from 0.2 to 2.5 kg
period 3: 41 days from 2.5 to 2.5 kg
period 4: not active
period 5: not active
duration of the plan: 90 days = 13 weeks
Standard values of concentrate plan 2
for all groups :
periods 1 -- 5 not active.
Concentrate 2--plan:
Enter 41 in keyboard menu 10 and proceed as with concentrate 1--plan.
40# A per.2 42 days
fr. 0.5 to 2.0kg
➔
40#
plan: 90 days
feed. plan: 77 days
40# target consum.
C1: 161 kg
Содержание TAK5-SA2-KFA-27-F1
Страница 2: ......
Страница 179: ...L Annex Example Milk ratio plan group A...
Страница 180: ...M Annex Example Milk ratio plan group B...
Страница 181: ...N Annex Form Feeding plan...
Страница 182: ...O Annex Form Concentration plan...