149
Service and Maintenance of the Concentrate Feeder
Commissioning the automatic feeder once again:
:
When commissioning the feeder again, check whether there is enough water in the heat
exchanger.
:
Proceed as for first commissioning.
:
Fill up the boiler of the heat exchanger with water.
-- You do not need to fill up the boiler regularly in case a few animals are fed with milk
containing a water share. If the animals only get milk, fill up the boiler of the heat
exchanger with water approx. every 3 months. Proceed as for start--up
(refer to
chapter 7.2, page 37, „Installing the Automatic Feeder, Filling the Boiler of the Heat
Exchanger with Water“).
16.2 Service and Maintenance of the Concentrate Feeder
Carry out daily:
:
Check the feed level of the concentrate feeder. Fill up the concentrate feeder, if
necessary.
:
Check whether there is remaining feed in the feed bowl and remove it, if necessary.
:
Keep the dosing flap clean and free from feed rests.
:
Check whether the LED of the feed contact lights up when the feed bowl is empty.
Carry out regularly:
:
Calibrate the concentrate regularly.
:
Check the calibration of the concentrate at least each time the concentrate is delivered or
crushed or rolled.
Shutdown:
:
Empty the concentrate feeder and remove feed rests.
:
Place the concentrate feeder in a dry and clean location.
:
For commissioning, proceed as for start--up.
Never spray the electrical parts with water!
Содержание TAK5-SA2-KFA-27-F1
Страница 2: ......
Страница 179: ...L Annex Example Milk ratio plan group A...
Страница 180: ...M Annex Example Milk ratio plan group B...
Страница 181: ...N Annex Form Feeding plan...
Страница 182: ...O Annex Form Concentration plan...