7. Maintenance
7-4 Performing calibration
124 / 168
1 Press the ▲ or ▼ key in maintenance mode several times
to select [2-1], then press the SET key.
2 Introduce the zero calibration gas, then press the SET key.
Zero calibration starts.
3 Check the zero calibration result.
If zero calibration is successful
[PASS] is displayed for three seconds before the display
automatically returns to [2-1].
If zero calibration is unsuccessful
[FAIL] is displayed and the display returns to [2-1] when the
SET key is pressed.
NOTE
If zero calibration is unsuccessful because the zero point (N2 in the case of oxygen) fluctuates
significantly around zero, [FAIL] is displayed. If this occurs, zero calibration was not performed.
7-4-3 Performing span adjustment
Perform the span adjustment required to ensure accurate measurement of gas concentrations.
Prepare the span adjustment gas, then connect to the product before starting span adjustment.
For information on span adjustment preparation, refer to ‘7-4-1 Calibration preparation’.
NOTE
Dedicated equipment is required for span adjustment. We recommend contacting Riken Keiki to request
the required equipment.
Содержание GD-3EC
Страница 28: ...2 Important Safety Information 2 4 Safety information 28 168 Connection examples GD 3RI GD 3ECB SD 3SC SD 3SC...
Страница 169: ...11 Appendix Revision History 169 168...
Страница 170: ...11 Appendix Revision History 170 168...
Страница 171: ...11 Appendix Revision History 171 168...
Страница 172: ...11 Appendix Revision History 172 168...
Страница 173: ...11 Appendix Revision History 173 168...
Страница 174: ...11 Appendix Revision History 174 168...
Страница 175: ...11 Appendix Revision History 175 168...
Страница 176: ...11 Appendix Revision History 176 168...
Страница 177: ...11 Appendix Revision History 177 168...