Express Lane Machine Operation, Maintenance, and Parts Manual
3-8
Rev. Date: 01/07
400-294-002
3.
Disconnect the tubing at the connectors, as shown in Figure 3-6 (circled).
4. Flush
and
backflush the filter.
5.
Reconnect the tubing.
6.
Wipe up any spills.
7.
Replace the hood on the frame and secure it in place with the two screws on each
side.
3.2.4 Checking The Waste Tank Seal
To ensure the proper vacuum is achieved, the waste tank seal must function correctly.
Therefore, each week you should closely inspect the waste tank seal to ensure it doesn’t
have nicks or cracks, isn’t rolled or bent, doesn’t have frayed or abraded areas, and is
securely attached to the vacuum motor.
3.2.5 Cleaning The Waste Tank
In addition to rinsing the waste tank after each use, you should also clean it weekly by
completing the steps below. Perform these steps with the machine in the
operating
position.
1.
Disconnect the vacuum hose and remove the waste tank from the Express.
2.
Pour a few drops of cleaner into the waste tank and add water until the waste tank
is about half full.
3.
Carefully swish around the solution in the waste tank. Be sure to get the upper
corners and around the intake opening.
4. Empty
the
cleaning solution from the waste tank.
5.
Rinse the waste tank under running water until the water runs clear.
6.
Reinstall the waste tank in the Express and reconnect the vacuum hose.
Содержание Express 294-115-200
Страница 2: ......
Страница 4: ...ii...
Страница 6: ...iv...
Страница 80: ...Troubleshooting 4 10 Rev Date 01 07 400 294 002 This page intentionally left blank...
Страница 83: ...Parts 400 294 002 Rev Date 01 07 5 3 MISCELLANEOUS...
Страница 85: ...Parts 400 294 002 Rev Date 01 07 5 5 294 115 116 Wiring Diagram...
Страница 87: ...Parts 400 294 002 Rev Date 01 07 5 7 FRAME and BODY...
Страница 107: ...Parts 400 294 002 Rev Date 01 07 5 27 VACHEAD and CLEANING...
Страница 117: ...Parts 400 294 002 Rev Date 01 07 5 37 CONDITIONING Oiling and Buffing...