![QubicaAMF Express 294-115-200 Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/qubicaamf/express-294-115-200/express-294-115-200_operation-maintenance-and-parts-manual_3559255058.webp)
Express Lane Machine Operation, Maintenance, and Parts Manual
3-20
Rev. Date: 01/07
400-294-002
4.
Remove the 14 #6 nuts that hold the stud bar in the Vac Head and set them aside.
5.
Remove the stud bar and squeegee from the Vac Head.
6.
Pull the old squeegee from the stud bar.
7.
Attach the new squeegee to the stud bar with the
smooth
side against the stud
bar.
8.
Reinstall the squeegee and stud bar into the Vac Head.
9.
Reinstall the 14 #6 nuts to attach the stud bar to the Vac Head. Reinstall the nuts
in the following pattern: one end, other end, middle, then all remaining nuts.
IMPORTANT
When replacing the back squeegee, DO NOT OVERTIGHTEN THE NUTS.
Tighten them until the nuts are just flush with the studs.
10. Replace the other squeegee.
11. Reinstall the Vac Head in the machine.
12. Secure the Vac Head in the machine with the two 5/16 hex head nuts.
13. Attach the vacuum hose to the Vac Head and tighten the screw on the vacuum
hose clamp.
14. Reinstall the hood and secure it to the frame.
3.4.3 Replacing The Wicking Foams
Depending on conditions such as how many lanes you have and how often you clean and
condition them, the wicking foams should last between four to six months. However,
whenever the Express starts leaving a wavy oil pattern or the oil output has decreased and
rotating the wicking foams does not alleviate the problem, you need to replace the wicking
foams.
NOTES
The Express cannot be used for approximately two hours after you have replaced
the wicking foams. This waiting period is required to allow the oil to be wicked to the
top of the foam. To verify the oil has wicked to the top of the foam, check the color
of the wicking foam. Because the wicking foam darkens as it wicks oil, you can
easily identify the lighter (no oil) area of the wicking foam. When the wicking foam is
all the same color, it is ready for use.
When you use the Express after replacing the wicking foams, clean, oil, and buff the
first lane twice to ensure the proper amount of oil is applied.
Содержание Express 294-115-200
Страница 2: ......
Страница 4: ...ii...
Страница 6: ...iv...
Страница 80: ...Troubleshooting 4 10 Rev Date 01 07 400 294 002 This page intentionally left blank...
Страница 83: ...Parts 400 294 002 Rev Date 01 07 5 3 MISCELLANEOUS...
Страница 85: ...Parts 400 294 002 Rev Date 01 07 5 5 294 115 116 Wiring Diagram...
Страница 87: ...Parts 400 294 002 Rev Date 01 07 5 7 FRAME and BODY...
Страница 107: ...Parts 400 294 002 Rev Date 01 07 5 27 VACHEAD and CLEANING...
Страница 117: ...Parts 400 294 002 Rev Date 01 07 5 37 CONDITIONING Oiling and Buffing...