![Porsche 2015 911 GT3 Cup Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/porsche/2015-911-gt3-cup/html/porsche/2015-911-gt3-cup/2015-911-gt3-cup_technical-manual_1580085076.webp)
Powertrain
2.9
Transmission assembly
2.9.1
Gearbox housing pre-assembly
Before putting together the transmission, all components of the transmission must
be cleaned and degreased thoroughly. In addition, a visual inspection must be carried
out. Especially the visual check of the oil holes is necessary to ensure perfect
function of the transmission. Because some work processes in these instructions are
linked with each other, completing individual work processes is possible only keeping
the complete assembly instructions in mind.
Mounting studs
Before mounting the studs, the thread holes must first be cleaned thoroughly with
petroleum benzine (brake cleaner) and afterwards with acetone. The gearbox housing
and the gear housing must finally be blown out with oil-free compressed air. A special
installation tool must be used to screw in the studs. The studs are not tightened with
a turning torque. After the studs are inserted, the adhesive connections have to set in
an oven at 130°C (266 F) for approx. 40 minutes. The heat of the housing can be
used for the next work step (inserting the bearings).
Cross shift lid studs
Dimensions:
M8x30
Porsche spare part No.:
999.062.044.01
Projection:
30 mm (1.18”)
Adhesive:
Loctite 2701 green
Thread position:
Screw in short thread
2.9.1.1
2.9.1.2
Version: 16.12.2014
75
911 GT3 Cup (991)
MY 2015
Содержание 2015 911 GT3 Cup
Страница 1: ...Technical manual 911 GT3 Cup 991 MY 2015...
Страница 255: ...Interior Version 16 12 2014 911 GT3 Cup 991 MJ 2015 254...