![Porsche 2015 911 GT3 Cup Скачать руководство пользователя страница 246](http://html1.mh-extra.com/html/porsche/2015-911-gt3-cup/2015-911-gt3-cup_technical-manual_1580085246.webp)
Bodywork
911 GT3 Cup (991)
MY 2015
4.17
Installing roof assembly
Preparation measure
Danger of material damage if specified curing time of
adhesive is not observed! In order to ensure that the
bonded joint is sufficiently strong, the following
conditions must be adhered to:
•
The vehicle must not be used until the curing
time has
•
Curing time: 2 hours
•
Temperature: at least 10 °C (50 °F)
•
Fixing time: approx. 1 hour
A drying time of at least 10 minutes must be observed between cleaning the frame
and applying primer! No cleaning solution residue may remain on the frame.
•
The adhesive has an open time of
15 min
, which means that the adhesive
must be applied and the component affixed within this period of time.
•
To ensure that the substance is completely mixed, apply a 30 mm long
bead of fresh adhesive to a piece of cardboard before processing.
NOTE
4.17.1
Version: 16.12.2014
245
Содержание 2015 911 GT3 Cup
Страница 1: ...Technical manual 911 GT3 Cup 991 MY 2015...
Страница 255: ...Interior Version 16 12 2014 911 GT3 Cup 991 MJ 2015 254...