![Panduit smartzone U01N11L Скачать руководство пользователя страница 90](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814090.webp)
SMARTZONE UPS INSTALLATION MANUAL
89
Appendix H
: What’s Included: Maintenance
Bypass Switch (UMB20K)
•
10-20kVA MBS [UMB20K] (1 unit)
•
Tower Mount Kit (with 6 pieces)
•
Rack Mounting Brackets (2 pieces)
•
Safety Warning Sheet (1 sheet)
•
Selection Guide (1 booklet)
•
Bypass Switch Sensor Cable (1 cable)
•
Output Breaker Sensor Cable (1 cable)
•
Rack Rail Mounting Kit [URMKIT2] (1 kit)
o
Left Slide Rail (1 rail mechanism)
o
Right Slide Rail (1 rail mechanism)
o
Phillips Pan Head M5x12 Screw (12 screws)
o
Phillips Hex Head M5x25 Screw (4 screws)
o
M5 Cage Nut (4 cage nuts)
o
Installation Sheet (1 sheet)
•
SJ1 Bus Bar Jumpers Installed (3 jumpers)
•
SJ2 Bus Bar Jumper (1 jumper)
•
SJ3 Bus Bar Jumper (1 jumper)
•
SJ4 Bus Bar Jumpers Installed (3 jumpers)
•
SJ5 Bus bar Jumper (1 jumper)
•
SJ6 Bus bar Jumper (1 jumper)
•
SJ7 Bus bar Jumper (1 jumper)
•
SJ8 Bus Bar Jumper (1 jumper)
•
SJ9 Bus bar Jumper (1 jumper)
•
SJ10 Bus bar Jumper (1 jumper)
•
SJ11 Bus Bar Jumper (1 jumper)
•
Non-insulated Ring Terminal (44 pieces)
•
Heat Shrink for Non-insulated Ring Terminal (44 pieces)
•
Hex Phillips Head M4x8 Jumper Screw (6 screws)
•
M32 Φ25mm Cable Gland (7 pieces)