![Panduit smartzone U01N11L Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814039.webp)
SMARTZONE UPS INSTALLATION MANUAL
38
due to physical configuration and physical weight of the unit.
CAUTION
⚫
The unit is heavy. Removing the unit from its carton requires a
minimum of two people.
⚫
If installing optional EBP(s), make sure to install the EBP(s)
directly next to the UPS so that all wiring between the units can
use the wiring provided with the units.
Note:
Tower mounting stands are required for each individual
unit.
2U Units (U01N11L, U01N11V, U01S11L, U01S11V, U01N12L,
U01N12V, U01S12L, U01S12V, U01N13V, U01S13V, U02N11L,
U02N11V, U02S11L, U02S11V, U02N12L, U02N12V, U02S12L,
U02S12V, U03N11L, U03N11V, U03S11L, U03S11V, U03N12L,
U03N12V, U03S12L, U03S12V, UVP024, UVP036, UVP048, UVP072)
1. Assemble the tower kit:
a. Align to interlock two tower feet at a right angle and rotate to snap together
(see figure below).
Figure 55: Tower Kit for 2U Units
2. Remove the faceplate:
a. Press both sides of UPS faceplate until the latches release (see figure below).