SMARTZONE UPS INSTALLATION MANUAL
76
Figure 91: Remove the Battery Baffles
e. Refer to the handling instruction, take out all three battery cartridges (see
figure below). Slide the two larger (8 batteries) battery cartridges and one
smaller (4 batteries) battery cartridge out of the EBP unit.
Figure 92: Remove Battery Cartridges from EBP
f. Refer to the handling instruction, slide the three new battery cartridges into the
EBP unit.
g. Reinstall the battery baffles the screws (reverse order of above steps).
h. Connect the new battery cartridges to the EBP. Press each connector tightly
together to ensure a proper connection. The larger battery cartridges connect
to connectors 1 and 3, each half of the smaller battery cartridge connect to
connectors 2 and 4.
i. Replace the EBP faceplate.
j. Turn both breakers on the back of EBP unit to the ON position.
3. After all, EBP battery cartridges in the system have been replaced and are connected
to the system.
4. Change the UPS in the system back to the Normal state.
5. Allow time for the UPS to transitions to the Normal state (about 30 seconds).
6.
Note:
If adding or removing EBP units to the system at the same time, appropriately