![Panduit smartzone U01N11L Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814034.webp)
SMARTZONE UPS INSTALLATION MANUAL
33
Figure 45: Install Cage Nuts in the Rear Equipment Rail with Square Holes
c. Install the front side of the rail kit with 2x Phillips Pan Head M5X12 screws
(see figure below) on each rail. Do not tighten the screws.
Figure 46: Install the Front Side of Rails
d. Adjust the rail size according to the depth of the rack
e. Install the rear side of the rail kit with 2x Phillips Pan Head M5X12 screws (see
figure below) on each rail.