SMARTZONE UPS INSTALLATION MANUAL
24
Figure 26: Install the Rear Side of Rails
d. Tighten all 10x screws to secure the rail kit to the rack.
e. Install the 2x M5 cage nuts in the rack front equipment rail, with square holes.
One in each of the third locations above the top rail kit screw (see figure
below).
Figure 27: Install Cage Nuts in the Front Equipment Rail with Square
Holes
2. Remove the faceplate:
a. Press both sides of EBP faceplate until the latches release (see figure below).
Then remove the faceplate form the front of the unit.