![Panduit smartzone U01N11L Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814028.webp)
SMARTZONE UPS INSTALLATION MANUAL
27
5. Install the EBP chassis into the rack:
a. Slide the EBP unit into the rack on the rail kit (see figure below).
Figure 33: Slide EBP into the Rack
b. Align the mounting brackets with the screw holes on the rack and secure the
EBP with the supplied 4x Phillips Hex Head M5 screws (see figure below).
Note:
The top Phillips Hex Head M5 screws will screw into the cage nuts. The
bottom Phillips Hex Head M5 screws will screw into the threaded rails.
Figure 34: Secure the Mounting Brackets to the Rack
6. Reinstall battery cartridges:
a. Refer to the handling instruction, reinsert the battery cartridges into the EBP
unit (see figure below).