SMARTZONE UPS INSTALLATION MANUAL
50
Figure 66: Connect the EBP(s) - Example 4x EBP System
4. Power up the system:
a. After all electrical connections have been made the system may be powered
up.
b. Ensure all breakers in the system are turned on.
c. Power ON all breakers on the back of each EBP in the system.
Note:
The
UVP240 EBP units have two breakers on the back of each unit, both breakers
must be powered ON for the EBP to function in the system. All other EBP units
have a single breaker on the back of the unit, this breaker must be powered
on for the EBP to function in the system.
d. Power ON all UPS output breakers, refer to the appropriate SmartZone UPS
User Manual for the location of the input breaker on each UPS unit.
e. Power ON all UPS input breakers, refer to the appropriate SmartZone UPS
User Manual for the location of the input breaker on each UPS unit.
f. For the 1-5kVA units with an input plug, the system may start powering up
depending on if the outlet that the UPS is plugged into has power.
g. For hardwired UPS systems and systems without a live input outlet, remove
the lock out tag out from the breaker panel and turn ON the panel breaker(s)
for the UPS system.
h. The system should start to power up, refer to the appropriate SmartZone UPS
User Manual to properly configure the system for use.