![Panduit smartzone U01N11L Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/panduit/smartzone-u01n11l/smartzone-u01n11l_installation-manual_3603814031.webp)
SMARTZONE UPS INSTALLATION MANUAL
30
Figure 39: Install the Rear Side of Rails
d. Tighten all 10x screws to secure the rail kit to the rack.
e. Install the 2x M5 cage nuts in the rack front equipment rail, with square holes.
One in each of the first locations below the bottom rail kit screw and one in
each of the third locations above the top rail kit screw (see figure below).
Figure 40: Install Cage Nuts in the Front Equipment Rail with Square
Holes
2. Install the mounting brackets:
a. Remove the 2x Phillips Flat Head M4x8 screws from the front of each side the
MBS and retain.
b. Align the mounting brackets with the screw holes on each side of the MBS and
secure with the previously removed Phillips Flat Head M4×8 screws (see
figure below).