FP2/FP2SH
Table of Contents
viii
Power supply sequence
•
In order to protect the power supply sequence, make sure to turn
off the PLC before the input/output power supply. If the input/output
power supply is turned off before the PLC, or if the PLC is not shut
off momentarily, the controller detects change of input level, and
might conduct an unexpected operation.
Before Turning On the Power (
Chapter 4 and Chapter 5)
When turning on the power for the first time, be sure to take the precautions given below.
•
When performing installation, check to make sure that there are no
scraps of wiring, particularly conductive fragments, adhering to the
unit.
•
Verify that the power supply wiring, I/O wiring, and power supply
voltage are all correct.
•
Sufficiently tighten the installation screws and terminal screws.
•
Set the mode selector to PROG. mode.
Before Entering a Program (
Chapter 5)
Be sure to perform a program clear operation before entering a program.
When using FPWIN GR software
Procedure:
1.
Execute “FPWIN GR”.
2.
ON the “Online” menu, select “Online Edit Mode”.
3.
ON the “Edit” menu, select “Clear Program”.
Battery
Do not install the battery when it is not used.
There is a possibility of leak if the battery remains discharged.
Содержание fp2/fp2sh
Страница 1: ......
Страница 19: ...Chapter 1 Overview ...
Страница 20: ...FP2 FP2SH Overview 1 2 ...
Страница 41: ...Chapter 2 Parts and Functions ...
Страница 42: ...FP2 FP2SH Parts and Functions 2 2 ...
Страница 76: ...FP2 FP2SH Parts and Functions 2 36 2 9 Input Units Specifications Pin Layout Input X0 to X1F 24V DC I II ...
Страница 109: ...Chapter 3 I O Allocation ...
Страница 110: ...FP2 FP2SH I O Allocation 3 2 ...
Страница 130: ...FP2 FP2SH I O Allocation 3 22 3 6 I O Numbers of Free Slots ...
Страница 131: ...Chapter 4 Installation and Wiring ...
Страница 132: ...FP2 FP2SH Installation and Wiring 4 2 ...
Страница 168: ...FP2 FP2SH Installation and Wiring 4 38 4 6 Safety Measures ...
Страница 169: ...Chapter 5 Procedure Until Operation ...
Страница 170: ...FP2 FP2SH Procedure Until Operation 5 2 ...
Страница 176: ...FP2 FP2SH Procedure Until Operation 5 8 5 2 Programming with Programming Tool Software ...
Страница 177: ...Chapter 6 FP2 FP2SH Operation ...
Страница 178: ...FP2 FP2SH FP2 FP2SH Operation 6 2 ...
Страница 210: ...FP2 FP2SH FP2 FP2SH Operation 6 34 6 8 FP2SH IC Memory Card Operation for FP2 C2P FP2 C3P ...
Страница 211: ...Chapter 7 IC Memory Card ...
Страница 212: ...FP2 FP2SH IC Memory Card 7 2 ...
Страница 237: ...Chapter 8 Self Diagnostic Function and Troubleshoot ing ...
Страница 238: ...FP2 FP2SH Self Diagnostic Function and Troubleshooting 8 2 ...
Страница 247: ...Chapter 9 Maintenance ...
Страница 248: ...FP2 FP2SH Maintenance 9 2 ...
Страница 255: ...Chapter 10 Specifications ...
Страница 256: ...FP2 FP2SH Specifications 10 2 ...
Страница 268: ...FP2 FP2SH Specifications 10 14 10 3 Cable Adapter Specifications ...
Страница 269: ...Chapter 11 Appendix ...
Страница 285: ...11 17 Example 2 When system register 4 sets 1 new Time chart 1 Time chart 2 ...
Страница 365: ...11 97 11 7 ASCII Codes ...
Страница 366: ...11 98 ...
Страница 372: ...Record of changes FP2 FP2SH R 2 ...
Страница 373: ......
Страница 374: ......