FP2/FP2SH
Procedure Until Operation
5
−
4
5.1
Before Turning ON the Power
5.1.2
Procedure Up To Operation
After installing and wiring, perform the operation by following procedure.
Procedure:
1.
Power on
1) Before turning on the power, check the items described on the pre-
vious page.
2) Turn on the power and then, check that the power supply unit’s POW-
ER LED and CPU’s PROG. LED are on.
2.
Enter the program
1) When using a programming tool, perform the operation “Clear Pro-
gram” before inputting.
2) Enter the program using the programming tool software.
3) Use the programming tool’s “total check function” to check for syntax
errors.
3.
Check output wiring
Use the forced I/O function to check the output wiring.
4.
Check input wiring
Check the input wiring by using the input display LEDs or the monitor-
ing function of the programming tool.
5.
Trial operation
1) Switch the mode selector from PROG. to RUN mode, check the RUN
LED turns on.
2) Check the operation of the program.
6.
Edit the program (debug) if necessary
1) If there is an error in the operation, check the program using the moni-
toring function of the programming tool.
2) Correct the program.
7.
Save the edited program
We highly recommend to save the created program onto a floppy disk
or hard disk. Printing out is also possible. The program can also be
saved on the ROM.
Содержание fp2/fp2sh
Страница 1: ......
Страница 19: ...Chapter 1 Overview ...
Страница 20: ...FP2 FP2SH Overview 1 2 ...
Страница 41: ...Chapter 2 Parts and Functions ...
Страница 42: ...FP2 FP2SH Parts and Functions 2 2 ...
Страница 76: ...FP2 FP2SH Parts and Functions 2 36 2 9 Input Units Specifications Pin Layout Input X0 to X1F 24V DC I II ...
Страница 109: ...Chapter 3 I O Allocation ...
Страница 110: ...FP2 FP2SH I O Allocation 3 2 ...
Страница 130: ...FP2 FP2SH I O Allocation 3 22 3 6 I O Numbers of Free Slots ...
Страница 131: ...Chapter 4 Installation and Wiring ...
Страница 132: ...FP2 FP2SH Installation and Wiring 4 2 ...
Страница 168: ...FP2 FP2SH Installation and Wiring 4 38 4 6 Safety Measures ...
Страница 169: ...Chapter 5 Procedure Until Operation ...
Страница 170: ...FP2 FP2SH Procedure Until Operation 5 2 ...
Страница 176: ...FP2 FP2SH Procedure Until Operation 5 8 5 2 Programming with Programming Tool Software ...
Страница 177: ...Chapter 6 FP2 FP2SH Operation ...
Страница 178: ...FP2 FP2SH FP2 FP2SH Operation 6 2 ...
Страница 210: ...FP2 FP2SH FP2 FP2SH Operation 6 34 6 8 FP2SH IC Memory Card Operation for FP2 C2P FP2 C3P ...
Страница 211: ...Chapter 7 IC Memory Card ...
Страница 212: ...FP2 FP2SH IC Memory Card 7 2 ...
Страница 237: ...Chapter 8 Self Diagnostic Function and Troubleshoot ing ...
Страница 238: ...FP2 FP2SH Self Diagnostic Function and Troubleshooting 8 2 ...
Страница 247: ...Chapter 9 Maintenance ...
Страница 248: ...FP2 FP2SH Maintenance 9 2 ...
Страница 255: ...Chapter 10 Specifications ...
Страница 256: ...FP2 FP2SH Specifications 10 2 ...
Страница 268: ...FP2 FP2SH Specifications 10 14 10 3 Cable Adapter Specifications ...
Страница 269: ...Chapter 11 Appendix ...
Страница 285: ...11 17 Example 2 When system register 4 sets 1 new Time chart 1 Time chart 2 ...
Страница 365: ...11 97 11 7 ASCII Codes ...
Страница 366: ...11 98 ...
Страница 372: ...Record of changes FP2 FP2SH R 2 ...
Страница 373: ......
Страница 374: ......