Overview
FP2/FP2SH
1
−
17
1.3
Expansion Function
1.3.2
Connection of MODEM
1:1 communication
Connections to a MODEM can be
made using the COM port.
1:N communication
Using the C-NET adapter enables MODEMs to be
connected for multiple programmable controller.
Commercially available
RS232C cable
MODEM
MODEM
MODEM
MODEM
Public line
Public line
Commercially available
RS232C cable
Two-core cable (RS485)
(VCTF0.75
×
2C)
FP2/FP2SH
FP2/FP2SH
S2 type
S2 type
FP2/FP2SH
C-NET adapter
(AFP8536/AFP8532)
A maximum of 32 stations can be connected.
COM port
PC
PC
The CPU of the FP2/FP2SH includes a COM (RS232C) port and TOOL (RS232C)
port as standard equipment, making it possible to connect a MODEM to perform pro-
gramming and computer linking from a remote location using a public telephone line.
When the power supply of FP2/FP2SH is turned on, it will verify whether a MODEM is
connected, and, if a MODEM is, it will automatically transmit the AT command to set the
MODEM for automatic reception.
Since the reading and writing of the relay conditions and register contents of the pro-
grammable controller can be performed from the host computer, this function is
applicable for remote monitoring systems.
When using the TOOL port, you can use programming tool software (NPST-GR/FPWIN
GR) and perform reading and writing of the programmable controller program and main-
tenance operations via MODEM.
During 1:1 communication using the COM port, an error alarm can be issued from the
programmable controller.
Содержание fp2/fp2sh
Страница 1: ......
Страница 19: ...Chapter 1 Overview ...
Страница 20: ...FP2 FP2SH Overview 1 2 ...
Страница 41: ...Chapter 2 Parts and Functions ...
Страница 42: ...FP2 FP2SH Parts and Functions 2 2 ...
Страница 76: ...FP2 FP2SH Parts and Functions 2 36 2 9 Input Units Specifications Pin Layout Input X0 to X1F 24V DC I II ...
Страница 109: ...Chapter 3 I O Allocation ...
Страница 110: ...FP2 FP2SH I O Allocation 3 2 ...
Страница 130: ...FP2 FP2SH I O Allocation 3 22 3 6 I O Numbers of Free Slots ...
Страница 131: ...Chapter 4 Installation and Wiring ...
Страница 132: ...FP2 FP2SH Installation and Wiring 4 2 ...
Страница 168: ...FP2 FP2SH Installation and Wiring 4 38 4 6 Safety Measures ...
Страница 169: ...Chapter 5 Procedure Until Operation ...
Страница 170: ...FP2 FP2SH Procedure Until Operation 5 2 ...
Страница 176: ...FP2 FP2SH Procedure Until Operation 5 8 5 2 Programming with Programming Tool Software ...
Страница 177: ...Chapter 6 FP2 FP2SH Operation ...
Страница 178: ...FP2 FP2SH FP2 FP2SH Operation 6 2 ...
Страница 210: ...FP2 FP2SH FP2 FP2SH Operation 6 34 6 8 FP2SH IC Memory Card Operation for FP2 C2P FP2 C3P ...
Страница 211: ...Chapter 7 IC Memory Card ...
Страница 212: ...FP2 FP2SH IC Memory Card 7 2 ...
Страница 237: ...Chapter 8 Self Diagnostic Function and Troubleshoot ing ...
Страница 238: ...FP2 FP2SH Self Diagnostic Function and Troubleshooting 8 2 ...
Страница 247: ...Chapter 9 Maintenance ...
Страница 248: ...FP2 FP2SH Maintenance 9 2 ...
Страница 255: ...Chapter 10 Specifications ...
Страница 256: ...FP2 FP2SH Specifications 10 2 ...
Страница 268: ...FP2 FP2SH Specifications 10 14 10 3 Cable Adapter Specifications ...
Страница 269: ...Chapter 11 Appendix ...
Страница 285: ...11 17 Example 2 When system register 4 sets 1 new Time chart 1 Time chart 2 ...
Страница 365: ...11 97 11 7 ASCII Codes ...
Страница 366: ...11 98 ...
Страница 372: ...Record of changes FP2 FP2SH R 2 ...
Страница 373: ......
Страница 374: ......