Manual Version e1-4.3.0.ae-R3.
Page
7
CAUTION
Air Sampling Checks: Before breaking seals and
undertaking air sampling checks, full Personal Protective
Equipment must be worn including a respirator. The
immediate area must be well ventilated. All non-essential
personnel must be evacuated to a safe area and air
sampling warning notices must be displayed in the
immediate vicinity. When undertaking air sampling tests,
checks must be made to ascertain the concentration of
residual gases and hazardous by-product gases such as
XeF
2
and HF.
CAUTION
Safety Goggles: It is recommended that maintenance
personnel wear safety goggles that conform to the current
local safety standards or minimally to BS EN 166 and/or
ANSI Z87.1.
2.3 Mechanical Safety
CAUTION
XeF
2
: When the system cannot be vented, there are strict
procedures that must be followed and full PPE suitable for
dealing with XeF
2
and its by-products must be worn. Please
refer to the MSDS for details on the PPE and contact SPTS
as soon as practicable for instruction.
CAUTION
Hazardous Gases/Materials: The gasbox
contains
equipment that may contain hazardous gases/materials.
Only SPTS approved technically qualified personnel who
are fully aware of all relevant safety precautions may open
the gasbox.
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...