Manual Version e1-4.3.0.ae-R3.
Page
25
Figure 7. Moving the Crated System
4.5 Uncrating the System
WARNING
BECAUSE OF THE WEIGHT OF THE E1 SERIES, THREE OR
MORE PEOPLE ARE REQUIRED DURING THE
INSTALLATION TO REMOVE THE UNIT FROM THE
SHIPPING CONTAINER AND TO POSITION IT INTO ITS
FINAL POSITION FOR OPERATION.
Using a power screwdriver, start opening the crate by removing the side panel labeled “Open This Side
First,” as shown in Figure 6.
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...