Manual Version e1-4.3.0.ae-R3.
Page
40
Figure 28. Main power controls.
Press the ON button to start up the e1 Series and the vacuum pump.
Since the system has not been running, let the system warm up for 4 hours so that the gas box
temperature can stabilize. Also, be certain that the room temperature is between 65ºF and 75ºF
(18ºC to 24ºC) and does not fluctuate.
After the warm-up period, start the computer system. Then, the e1 Series control program, which is
located under; Start Button; Programs; Xactix; Xetch, will auto start (if it is not set to auto start, it can be
started manually).
After the initialization procedure, a dialog box will appear as below:
Power ON
Power OFF
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...