Wait 25 minutes. If the
expansion chamber pressure
changes by 0.2 Torr or more
then there is a probably leak in
the connection to the bottle or
at the NPT to VCR adapter.
Tighten the VCR connection
slightly and see if that solves
the leak. If not, continue to
pump for another 5 minutes to
remove any XeF2 left in the
lines and close the valves.
Loosen the VCR connection to
the bottle and check the
tightness of the NPT to VCR
adapter in the bottle valve.
Replace the gasket at the bottle
VCR fitting and rerun the leak
test starting at Step 6.17.1.5.
6.17.1.9
If this procedure continues to
fail, remove the bottle and
install a VCR plug with a new
VCR gasket. Rerun the
procedure starting at Step
6.17.1.5.
6.17.1.10
If Step 6.17.1.9 passes, remove
the NPT to VCR adapter,
remove any Teflon tape, re-
apply a fresh wrap of Teflon
tape, and re-install into the
system. Rerun the procedure
starting at Step 6.17.1.5 and
this should solve the problem.
If Step 6.17.1.9 does not pass,
it may be necessary to use a
helium leak detector to check
for other leaks.
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...