Manual Version e1-4.3.0.ae-R3.
Page
19
WARNING
ANY INTERRUPTION OF THE EARTH CONNECTION INSIDE
OR OUTSIDE THE E1 SERIES IS LIKELY TO MAKE THE
UNIT DANGEROUS. THE SAFETY EARTH CONNECTION
SHOULD FULFILL ALL LOCAL SAFETY REQUIREMENTS.
ENSURE THAT THIS IS CHECKED DURING THE PRE-
INSTALLATION SITE CHECK.
4.1.6
Gas Requirements
•
At a minimum, one cylinder of nitrogen gas containing a minimum of 40 cubic feet of gas must
be available during installation. Utilizing a wall- or bench-mounted support bracket, this cylinder
should be firmly secured to prevent possible damage or explosion of the cylinder and/or
cylinder valve. The customer must also provide a suitable pressure regulator (Matheson MA-18
or equivalent) with a shut-off valve for the process gas supply.
•
A source of clean dry air, compressed to 70-100 psi is required for operation of the pneumatic
valves. The customer must provide a suitable pressure regulator with shut-off valve for the CDA
supply.
•
One standard cylinder filled with xenon difluoride, (not included with the e1 Series), should also
be available for installation within the system. A schematic of a typical cylinder can be found on
page 23.
Flow
Pressure
Nitrogen
4 l/min (max)
206 kPa
Clean Dry Air (CDA)
1 l/min (max)
482-689 kPa
Vacuum
>4.5 m
3
/hr
<6 Pa ultimate
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...