Manual Version e1-4.3.0.ae-R3.
Page
75
Process Purge Low
Allows the user to set the vacuum pressure for the process chamber purge cycles during the machine
startup.
Exp Purge Cycles
Allows the user to set the number of purge cycles for expansion chamber during the machine startup.
Exp Purge High
Allows the user to set the nitrogen pressure for expansion chamber purge cycles during the machine
startup.
Exp Purge Low
Allows the user to set the vacuum pressure expansion chamber purge cycles during the machine
startup.
Flush Cycles
Allows the user to set the number of flush cycles during the machine startup.
A flush cycle consists of:
•
20 seconds that V7, V5, V3, and V11 are open
•
20 seconds that V7, V5, V3, V11, and V6 are open
•
20
seconds that V3, V11, and V6 are open
•
20 seconds that V3 and V8 are open
Содержание SPTS Xactix e1 Series
Страница 1: ...Manual Version e1 4 3 0 ae R3 2015 04 Xactix e1 Series System Manual ...
Страница 38: ...Manual Version e1 4 3 0 ae R3 Page 36 Figure 23 Shroud ventillation connection Shroud ventilation connection ...
Страница 40: ...Manual Version e1 4 3 0 ae R3 Page 38 Figure 26 Showerhead stop installed ...
Страница 48: ...Manual Version e1 4 3 0 ae R3 Page 46 Figure 29 Chamber ventilation shroud moved to back ...
Страница 49: ...Manual Version e1 4 3 0 ae R3 Page 47 Figure 30 Chamber ventilation shroud pulled forward ...
Страница 83: ...Manual Version e1 4 3 0 ae R3 Page 81 ...
Страница 86: ...Manual Version e1 4 3 0 ae R3 Page 84 ...
Страница 101: ...Manual Version e1 4 3 0 ae R3 Page 99 Figure 46 Gax box heater ...
Страница 103: ...Manual Version e1 4 3 0 ae R3 Page 101 Figure 48 Vacuum interlock switches Chamber vacuum switch Main vacuum switch ...
Страница 109: ...Manual Version e1 4 3 0 ae R3 Page 107 9 Set number of purge cycles to 0 and Hard Pump Time to 10 minutes ...